Project Description
Major pipeline infrastructure project connecting Syncrude operations within Suncor's integrated oil sands facility. Critical infrastructure linking processing units and transportation systems.Paul Ekberg was the lead scheduler planner for the Wood Engineering executed scope for Engineering & Procurement of Suncor's Syncrude interconnecting pipeline that completed in 2022. This project was designed to transport sour naphtha as two bi-directional pipelines to carry feedstock from Suncor to Syncrude, and vice versa were constructed with the goal of enhancing operational flexibility at Syncrude.
Project Timeline
Project Planning: 2006-2014
Environmental Assessment: 2014-2022
Permitting Phase: 2022-2025
Construction Start: Mid-2020s
Operations Begin: Mid-2030s
JKJPM's Role & Implementation Approach
Managed complex pipeline infrastructure project coordination across multiple operational areas
Implemented specialized safety protocols for pipeline installation in active industrial environment
Coordinated regulatory compliance and environmental protection measures
Led multi-contractor coordination and resource scheduling optimization
Lessons Learned
Pipeline projects in active industrial settings require extensive safety planning and coordination
Environmental protection measures must be integrated throughout pipeline routing and installation
Multi-contractor coordination is critical for maintaining project schedule and quality standards
Regulatory compliance for pipeline projects requires early engagement and continuous monitoring
https://www.suncor.com/en-ca/what-we-do/oil-sands/base-plant-operations
Project Url 2
Key Focus Areas
Pipeline Infrastructure, Industrial Safety, Environmental Protection, Multi-Contractor Coordination, Regulatory Compliance