Beginning with the conceptual study in 2004 as an Engineering Co-op student with Neill & Gunter Consulting Engineers and working on designs for coal conveyor, HVAC and cooling water piping systems - our founder Paul Ekberg rejoined the project during the detailed engineering phase with Stantec Consulting Engineers in 2011 as the Lead Planner / Scheduler for the BD3 Unit Boiler and Auxiliaries Retrofit and Interconnecting Ductwork areas of the project. This included supporting the lead esitmator in development of the capital cost estimate and developing and maintaining a resource loaded schedule for reporting, progress measurement and cost control of a $30M Engineering fee contract for the Engineering, Procurement of the BD3 Retrofit and Owner's Engineering functions for the overall ICCS project.